Wood chip boiler house reconstruction in Kusa (capacity: 1 MW)
Client: SIA “Madonas Siltums”
Address: Kusa, Aronas pagasts, Madonas novads
P.M.G.’s role: General building contractor
Boiler house total electrical capacity: 1 MW
Execution time: 03.2019.–10.2019.