Construction of a biodegradable waste recycling facility at the GETLIŅI landfill

Construction in accordance with a FIDIC agreement

Client: SIA “GETLIŅI EKO”

Address: Kaudzīšu iela 57, Rumbula, Stopiņu novads

P.M.G.’s role: Construction supervision, engineering supervision

Construction output:

construction area: 15 264 m2

total area: 21 254 m2

amount of concrete: 16 000 m2

Construction cost: 36 600 000 EUR

Execution time: 10.2019.–03.2021.

CONSTRUCTION SUPERVISION | Industrial buildings and engineering structures