Reconstruction of the 330 kV substation’s switchgear at Riga HPP
Client: AS ‘’Augstsprieguma tīkls’’
Address: Rīgas HES, Salaspils pagasts, Salaspils novads
P.M.G.’s role: Construction supervision
Construction output: reconstruction of the 330 kV switchgear
Construction cost: 670 000 EUR
Execution time: 04.2019.–11.2020.