Wood chip boiler house in Vestiena (capacity: 0.6 MW)
Client: SIA “Bērzaunes komunālais uzņēmums”
Address: Muižas gatve 5, Vestiena, Madonas novads
P.M.G.’s role: General building contractor
Boiler house total electrical capacity: 0.6 MW
Execution time: 08.2020.–03.2021.